Removing ground materials during the construction of a large residential housing development

Case / Project Summary

Industry:

Logistics & Transport, Residential Development

Client:

Nationwide House Builder

Location:

North-West UK

Overview:

The job specification was to remove 7,000m3 of inert soils generated during the groundworks phase of development.

Our client requested that the material be moved within a strict time limit of 20 working days which required us to move 40 loads per day.

DHI Services Used:

Result:

We successfully moved an average of 45 per day from site. All material was identified as suitable for reuse within our centralised database of live schemes and was transported to a void space as opposed to sending to landfill.

SHARE

Need groundworks material removed in a tight timeframe?

Let us talk you through this case study in full.

Outcomes

0
m3
Inert soils removed
0
Loads per day
0
Days
Time Limit
0
%
Carbon reduction

We deliver cost-effective and sustainable material management solutions.